Examples of completed projects

  • PJSC "Power Machines"
    Modernization of the 110 kV outdoor switchgear (ORU-110 kV) at Substation-54.
  • PJSC "Rosseti Moscow Region"
    Repair of 35–220 kV overhead power lines (OHL) for the needs of SES, MOESK branch, in 2020–2022.
  • PJSC "Rosseti Moscow Region"
    Modernization of the 110 kV Orevо–Ekran OHL (12.108 km; 6,054 linear meters) for SES needs.
  • JSC "Dagestan Grid Company"
    Repair of electrical grid equipment and transformer substation (TS/DS) buildings within the responsibility zones of Derbent HES, Tabasaran RES, and Kaytagsky RES.
  • PJSC "Rosseti Moscow Region"
    Modernization of the 110 kV Orevо OHL for SES needs.
  • JSC "CIUS UPS"
    Comprehensive reconstruction of 0.4–6–110 kV overhead power lines.
  • JSC "Khmetyevo"
    Construction of 110 kV Sigma–Senezh cable line connections to the 110 kV "Khmetyevo" substation.
  • JSC "Rosseti CIUS UPS"
    Reconstruction of grid facilities for the construction of the M-12 Moscow–Nizhny Novgorod–Kazan expressway.
  • JSC "Tyumenenergo"
    Major repair of the 110 kV overhead power line.